General Steps for Export Preparation

Step 1: Procurement and Quality Check (1-2 Days)

  • Collect coconuts and conduct grading, cleaning, and packing as per export standards.

Step 2: Documentation and Approvals (2-3 Days)

  • Required documents:
    • Invoice
    • Packing List
    • Phytosanitary Certificate
    • Certificate of Origin
    • Bill of Lading (issued post-loading)

Step 3: Transportation to the Port

  • The transport time varies based on the port (details below).

Step 4: Customs Clearance at the Port (2-3 Days)

  • Submit documents, undergo inspections, and pay any applicable duties.

Step 5: Loading and Transit to Port

  • Duration varies depending on the port.

Key Factors to Consider

  1. Transit Mode: For Mumbai and Tuticorin, rail or multi-modal transport can be considered for cost-efficiency and timing.
  2. Port Selection:
    • Cochin: Best for shorter transit times.
    • Mumbai: Ideal for regions with lower transport costs but faster sea transit.
    • Tuticorin: Suitable for larger volumes with slightly longer sea transit.
  3. Shipping Line Schedules: Confirm vessel availability and schedules to align with your shipping timelines

Main Menu